View Single Post
  #38  
Old 02-13-2024, 01:45 PM
mgarblik mgarblik is offline
Ultimate Warrior
 
Join Date: Mar 2005
Posts: 6,236
Default

Quote:
Originally Posted by Skip Fix View Post
Mine had SD do that.
As far as Parts Place porting-the problem both of mine had was missing metal where it needed to seal, and one needed weld on the top of the ports.
That's the exact problem the one brought to me had. By the time the ports were straightened out to get a decent match to the heads and gaskets, there was no more than .060" left for a gasket seal at the top of 3-4 of the ports. Welding the outside top would have effected the look of the manifold. Also the flanges would have needed to be set-up in the mill and surfaced. The cost to make these repairs would have been substantially more than the manifold cost. IMO, if they are going to cast a crappy, core shifted manifold in China, please leave plenty of material so it can be repaired without welding. That would be much easier to work with.

The Following User Says Thank You to mgarblik For This Useful Post: